I applied in-person. The process took 1 week. I interviewed at Triple Point Technology (Pune) in Apr 2017
Interview
Only one round with hands on. There were 2 people who took the interview. Was given time to write the code and a laptop. Although the design was named the expectation was more like enhancements etc which was not great.
I applied through other source. I interviewed at Triple Point Technology (Westport, CT)
Interview
Too long, too many rounds. Be prepared to stay for almost a day for the interview.
Total 7 to 8 rounds. Communication skills check, behavioral test, technical round, and final round with VP of engineering