I applied online. The process took 4 months. I interviewed at SLB (Sugar Land, TX) in Jan 2013
Interview
I applied online. Got a call from one of the company recruiter and waited 1 month. After that I sent an email to followup. Then she let me know that they are having an interview. I said I am interested. The interview was in Sugarland,TX. On first day, they presented about their company. After that there was a catapult building. We had 6 people, so they splited us into two groups.Next day there was technical presentation on any project we worked on. After the presentation there was 4 interviews. Each interviews were 45 min long. there were two people in each group. One group was very hard in questioning. They
Interview questions [1]
Question 1
1. How do you handle pressure situation
2. Do I have GD&T experience?
3. Do I have drilling tools design experience?
4. How does car motor and engine work?
5. Showed on 2D drawing of a tools and had to explain how the tool works