I applied through university. I interviewed at Rantec Power Systems
Interview
Really bad communication, the interview was also 2.5 hours long and 30 min of technical questions on heat transfer, tolerance stackup, engineering design process and find whats wrong with the drawings. I was also sick so it was horrible time there. That was onsite.
Positive experience
Average interview
Application
I applied online. The process took 2 weeks. I interviewed at Rantec Power Systems (Los Osos, CA) in Dec 2021
Interview
Screening interview with hr. Very nice woman.
Then meeting with An engineer. Not the most friendly of people. Asked basic questions about experience and industry knowledge. Meeting was over the phone
I applied online. The process took 2 weeks. I interviewed at Rantec Power Systems (Los Osos, CA)
Interview
First had a phone interview with HR as a screener I assume, then I got a second interview scheduled in person. In person interview included a few people. First person I talked to was manufacturing floor manager, then engineering manager, then mechanical engineer manager. There was a small skill assessment with some basic heat transfer concepts, some tolerance stacking questions, and a "spot the errors on this engineering drawing" question.