I applied in-person. The process took 1 day. I interviewed at Pacific Ship Repair and Fabrication in Sept 2016
Interview
I went in for a test plate. I passed and they hired me on the spot. The test was on flux core 1g and mig 1g. Pritty easy. The only hard test was they had me weld on 14 gage metal with mig. Witch I had never done.