I applied through a recruiter. The process took 3 weeks. I interviewed at Innovo Construction (Cairo, Cairo Governorate) in Apr 2023
Interview
A long process of interviewing, and a somewhat long wait at times. It was not very clear to describe the job purpose or the needs. Misleading as the job description did not provide all the needed aspects or what is to be covered in the position.
Interview questions [1]
Question 1
would I be willing to wait for the launch of the local production line?