I applied through a staffing agency. The process took 1 week. I interviewed at Generac Power Systems (Waukesha, WI) in Aug 2014
Interview
There were a few rounds of interviews. First there was a skills review test. Then a technical round of interview from the Vendor. After I got through the technical round, there was a background check by the vendor. Then a final technical round by the people at Generac.
Interview questions [1]
Question 1
Have you ever created Functional requirements document, technical specifications document? Where? and How?