I applied through university. The process took 1 week. I interviewed at First Quality (Philadelphia, PA) in Apr 2012
Interview
I applied to this position through the career center at my university. I was contacted within 5 days of sending in my resume. I did a brief interview over the phone and then was invited in to interview with an HR representative, the head electrical engineer, and the head of the engineering team.
Interview questions [1]
Question 1
Why would it make sense to have multiple power substations located inside of a manufacturing plant?