I applied through a recruiter. The process took 5 weeks. I interviewed at Arpac Group (Schiller Park, IL) in Mar 2013
Interview
Interviewed by manager and one engineer, after being interviewed by the VP of the department. I was asked situational questions applying to the positions, asked about working with others, asked to describe what I thought a typical day would be like, etc. The interview was easy, but the engineering department did have me read some drawings and describe some electrical situations as well.